027 733 8528

News Feed

  • 0 300km detour while Remutaka Hill closed

    0.00 of 0 votes

    Detour while SH2 Remutaka Hill is closed is Northbound traffic detour via SH1 to Ohau, then turn right onto SH57, continue along SH57 and then turn right onto SH3, continue along SH3 until you rejoin SH2 in Woodville. Reverse for southbound. Please note: this detour route will add approximately three and a half hours to your journey time. Get Txt Road alerts at https://road.lert.info/

  • 0 Highway closure mean 180km Detour for some.

    0.00 of 0 votes

    Following the recent heavy rain SH3 Piopio Makau and SH43 Taumaranui to Whangamomoa are closed. The detour is Whanganui to Taumaranui - About 180KM

  • 0 Summary of roads closures or delays greater than 20mins

    0.00 of 0 votes

    As of 9:38 AM on Tuesday, 10 March 2026, here are the crash and significant road disruption reports meeting your criteria (posted/updated within the last 120 minutes, involving closures or delays exceeding 20 minutes). NZTA / Waka Kotahi & Official Alerts SH43 Tokorima (Between Mangaparo Rd and Mangatarata Rd) Status: CLOSED Details: The road entered a scheduled full closure at 9:00 AM for major road rebuild works. It is expected to remain closed until 12:00 PM today. Impact: No detour is available during this window; motorists must wait for the road to reopen. Source: NZTA Journey Planner - Traffic Table SH3 Woodville (Between Ross St and Fergusson St) Status: Significant Delays / Road Works Details: Resurfacing works began at 6:00 AM today. Current reports indicate high morning volumes are struggling with the Stop/Go management. Impact: Delays are currently estimated at 20–30 minutes during peak flow. Temporary speed limits (30km/h) are in place. Source: NZTA Journey Planner SH2 Pukehina (Near Station Road) Status: Congestion / Road Works Details: Major resurfacing and lane diversions are active this morning. Impact: Regional commuters report "crawling" traffic with delays exceeding 20 minutes for those traveling through the site. Source: NZTA Journey Planner   Summary of Major Disruptions Location Issue Status Expected Delay SH43 Tokorima Road Rebuild CLOSED 3 Hours (No Detour) SH1 Bombay Truck/Car Crash Lane Blocked 25+ Minutes SH1 Taihape Serious Crash/Spill Diversion 20+ Minutes SH3 Woodville Resurfacing Stop/Go 20-30 Minutes

  • 0 Marlborough Crash a headache for Travellers

    0.00 of 0 votes

        Based on the current ferry schedules and service alerts for Sunday, 22 February 2026 (5:45 PM NZDT), here is the status for travelers affected by the SH1 closure in Marlborough. Ferry Service Status & Departures While ferry operators are aware of the "Road Closed" status on SH1 south of Seddon, they generally do not hold scheduled departures for individual delayed vehicles due to the strict turnaround times required for subsequent sailings. Interislander Status Next Departure from Picton: The Kaitaki is scheduled to depart at 9:30 PM. Check-in Deadline: You must be checked in at least 60 minutes before departure (8:30 PM). Alert: Interislander has issued a travel alert acknowledging the SH1 crash at Redwood Pass. They advise travelers to use the inland detour (SH63/SH6) but warn that this route takes significantly longer. Advice: If you cannot make the 9:30 PM sailing, contact Interislander immediately at 0800 802 802 to discuss rebooking, though space is extremely limited this month. Bluebridge Status Next Departure from Picton: The Livia is scheduled to depart at 7:15 PM. Check-in Deadline: Standard check-in closes 60 minutes before departure (6:15 PM). Given the current time (5:45 PM) and the SH1 closure, anyone currently stuck south of the crash site will almost certainly miss this sailing. Availability: Bluebridge reports that most vehicle space is fully booked through February. If you are delayed, call 0800 844 844 as soon as possible. Travel Time Reality Check If you are coming from the south (e.g., Kaikōura or Christchurch) and heading to Picton: Direct Route (SH1): Still CLOSED. Inland Detour: Taking the Lewis Pass/Wairau Valley detour (SH7/SH63) will take approximately 5.5 to 6 hours from Christchurch to Picton. Estimation: If you leave the Waipara area now, you likely won't reach Picton until approximately 11:00 PM – 12:00 AM, missing the final evening sailings for both companies. Accommodation Warning Because many travelers will miss their ferries tonight, accommodation in Picton and Blenheim is expected to be at capacity. If you realize you cannot make your sailing, it is highly recommended to book a room in Kaikōura or Murchison now before they fill up.

  • 0 Road Closure: SH7 Reefton to Springs Junction (Rahu Saddle)

    0.00 of 0 votes

    Road Works Due to culvert replacement works, this section of road will be closed in both directions on Tuesday 4th November between 8am and 4pm and on Wednesday 5th November between 8am and 12pm. In addition, the road will close on Wednesday 5th November between 1pm and 5pm with the road reopening every hour to allow queued traffic through the site. Various temporary traffic management will be in place on Thursday 6th November between 8am and 4pm. Plan your journey accordingly. Detour route During closures. detour via SH65, SH6 and SH69. Please note this detour will add approximately one and a half hours to your journey time. On Thursday 6th November, expect up to 30 minute delays Start 4 Nov 2025 8:00am End 6 Nov 2025 4:00pm Expected resolution Until further notice Last updated 4 Nov 2025 8:00am

  • 0 Scheduled Road Work: SH 1 Blenheim to Seddon (Weld Pass)

    0.00 of 0 votes

    Resurfacing Due to paving works, this section of road will be closed in both directions on Wednesday 29th January to Thursday 13th February nights between 7pm and 5am (Excluding the nights of Wednesday 5th February and Thursday 6th February). The road will reopen every night at midnight to allow queued traffic through the site. Plan your journey accordingly and avoid travel during these times. Detour route Detour via SH7 Lewis Pass Start 29 Jan 2025 7:00pm End 14 Feb 2025 5:00am Expected resolution 14 Feb 2025 5:00am Last updated 28 Jan 2025 3:34pm For Txt Road Alerts - www.road.lert.info

  • 2 Waiouru Detour Travel Time

    0.00 of 0 votes

    We have done an estimate of the travel time for the Waiouru detour through National Park. At an average speed of 80kph (Allowing for more traffic and all the trucks) we estimate the time to be more likely 1Hr 20mins. There is no sense making risky manoeuvres because you’re impatient, just wait for a good passing area. The less closures because of crashes, the better for all.   Get Txt Road Alerts at Road Alerts Every day alerts that could affect you Click Here

ABOUT LERT INFO

Lert Info has been designed to provide safety alerts for the public. It is a private company that gets no Government funding.

It’s arguably NZ’s most comprehensive and advanced alert service.

We have our own Meteorological technician, our own programmers and our own networker who are passionate that you have the best service

OUR INFORMATION

96, London Street, Dunedin,

New Zealand

Email: 027 733 8528

Email: Stuart@Lert.co.nz

© Lert Info all rights reserved-2024